Home  >  Calculators  >  Construction  >  Concrete Footing Calculator
Foundations

Concrete Footing Calculator

Calculate concrete volume for cylindrical sonotube piers, continuous wall footings, and deck posts.

Concrete Footing Calculator

Required Material Volume
1.23
Cubic Yards (yd3)
Includes 10% safety margin (Net: 1.12 yd3)
Cubic Feet
33.3 ft3
Estimated Weight
1.66 Tons
Cubic Meters
0.94 m3
Total Weight (Lbs)
3,330 lbs
Retail Bags and Delivery Guide
2.0 cu ft Bags (Mulch / Soil): 17 bags
80 lb Concrete Bags: 42 bags
Standard Pickup Truck Loads (~2 yd3): 1 load

Footings are the structural foundation elements that transfer building loads to stable soil – their volume must be calculated precisely to ensure adequate material is on hand during the pour, since footings cannot be patched or cold-jointed without compromising structural integrity. Footings come in two common forms: continuous strip footings (long rectangles supporting walls) and isolated pad footings or round piers (supporting columns). This footing calculator handles both shapes, accepts depth in feet or inches, and outputs cubic yards for ready-mix ordering alongside an 80 lb bag equivalent for smaller post-and-pier projects.

How to Use This Calculator

1

Identify Footing Type

Use the Rectangle tab for continuous strip footings under walls. Use the Circle tab for round concrete piers or column pad footings.

2

Enter Footing Dimensions

For strip footings: enter total run length, footing width, and footing depth in inches. For piers: enter diameter and depth. Standard residential footing depth is 8 12 inches; structural footings vary by engineer specification.

3

Account for Multiple Footings

If you have multiple identical pier footings, calculate one and multiply the cubic yard result by the number of piers. Sum with any strip footing volume for total order quantity.

4

Select Concrete Preset and Add 5% Buffer

Choose ‘Ready-Mix Concrete’. Add a 5% buffer for formed pours into clean excavated trenches.

5

Round Up for Ready-Mix Order

Round your total to the nearest 0.25 yd³. For footings under 1 cubic yard total, bagged concrete is typically more economical.

When to Use This Calculator

  • Continuous strip footing volume for new residential foundation walls and basement construction.
  • Isolated pier and column pad footing volume for deck posts, outbuilding supports, and structural columns.
  • Fence post footing estimation – calculating the concrete volume for a series of round tube-form post holes.
  • Garage and outbuilding foundation volume for a complete ready-mix or bagged concrete order.

Professional Tips and Best Practices

Footing dimensions must follow local building code and soil bearing capacity – always confirm with your local authority.

Footings must bear below the frost depth for your region – in northern climates, this can be 36 48 inches.

For post footings, the ACI rule of thumb is: footing diameter = 2× post diameter, footing depth = 1/3 post length above grade.

Pour footings when air temperature is between 40°F and 90°F – extreme temperatures require special cold-weather or hot-weather concrete mix adjustments.

Calculation Formula Explained

Pier Volume = π × Radius² × Depth; Yards = cu ft ÷ 27

To calculate cubic yards accurately, ensure all dimensions are normalized to feet before multiplying. Since 1 yard equals 3 linear feet, a cubic yard contains exactly 27 cubic feet (3 x 3 x 3 = 27). Dividing total cubic feet by 27 produces exact cubic yards.

Worked Real-World Example

Example: Four 12-inch diameter cylindrical piers (radius = 0.5 ft), 4 ft deep below frost line: Per pier = π × 0.5² × 4 = 3.14 cu ft. Total for 4 piers = 12.57 cu ft ÷ 27 = 0.47 cubic yards (approx 21 bags of 80 lb concrete).

Common Mistakes to Avoid

  • Digging footings above the regional frost depth line.
  • Failing to bell out the footing base for greater load-bearing surface.

You Might Also Need

Footings are typically the first pour – once cured, calculate the wall or slab above with the Concrete Slab Calculator. For large footing pours, use the Concrete Calculator for a combined volume across multiple shapes. If you are excavating for footings, estimate cut volume first with the Excavation Calculator.

Frequently Asked Questions

Clear answers to common questions about concrete footing calculator.

Deck footings must extend at least 12 inches below the local frost line (often 36 to 48 inches in northern climates).
A 12-inch tube 4 feet deep requires 3.14 cubic feet of concrete, which equals approximately 5.3 bags of 80 lb concrete.
Scroll to Top